Article 4 directions in Doncaster
These remove specific permitted development rights in defined areas. Check whether your street is inside one before relying on the national limits.
- Article 4 (DSA) Boundary - Came into force 25 July 2024Check with the council2024
- Article 4 (Balby Board School (DLHL04)) Boundary - Came into force 22 July 2024Check with the council2024
- Article 4 (HMO) Boundary - Came into force 14 October 2019Change of use2019
From planning.data.gov.uk, Sep 2026. Councils publish at different levels of detail — confirm the scope of any direction with Doncaster Metropolitan Borough Council.
Conservation areas
Each links to its own page: boundary map, what it changes, and the council’s appraisal.
What you can build in Doncaster
The national limits for a semi-detached house with full permitted development rights. Inside a conservation area or Article 4 area, some of these need planning permission.
Getting a Lawful Development Certificate from Doncaster Metropolitan Borough Council
Apply through the Planning Portal. Decisions usually take up to 8 weeks. Your report tells you whether you need one — and includes the drawings checklist.
Doncaster Metropolitan Borough Council website ↗Nearby councils